Green steel structure buildings from Chinese manufacturer Liweiyuan utilize steel as the primary load-bearing material, combining the material properties of steel with sustainable green building concepts such as energy conservation and environmental protection. Our products are designed to maximize energy conservation and provide customers with healthy and practical living environments and spaces.
Green steel structure buildings from Chinese manufacturer Liweiyuan utilize steel as the primary load-bearing material, combining the material properties of steel with sustainable green building concepts such as energy conservation and environmental protection. Our products are designed to maximize energy conservation and provide customers with healthy and practical living environments and spaces.
Our Green Steel Structure Buildings are highly efficient and environmentally friendly, reducing environmental pollution and carbon emissions. Liweiyuan's production focuses on factory prefabrication and on-site assembly. Steel components are standardized and manufactured in Chinese factories, then transported to the construction site for rapid assembly. This method improves production efficiency.
They utilize highly sustainable materials. Our steel is one of the most recyclable building materials and can be recycled multiple times, reducing resource consumption and construction waste. It offers high structural strength and excellent seismic resistance. Furthermore, it provides flexible and aesthetically pleasing spatial layouts, natural ventilation and daylighting, and incorporates green technologies for energy conservation and environmental protection.
Liweiyuan Green Steel Structure Buildings utilize a low-carbon design. Although steel production has a higher carbon footprint, its lifecycle carbon emissions are 15%-30% lower than those of concrete buildings.
1. The design philosophy of Liweiyuan's green steel structures differs from that of traditional steel structures.
Our products are primarily guided by a "green lifecycle" approach, integrating the entire process of material production, construction, operation, and demolition into the design phase to proactively optimize carbon reduction pathways. Traditional steel structures, on the other hand, focus on structural safety, functional requirements, and economic efficiency, with less consideration given to environmental friendliness, operational energy consumption, and post-demolition recycling.
2. Liweiyuan's green steel structures differ from traditional steel structures in their material selection.
Green steel structures utilize low-carbon steel, recycled steel, and auxiliary materials, such as high-quality low-carbon steel grades like A36, A572, and G355B. These steel grades meet environmental quality standards and can reduce the environmental impact of materials from the source.
3. The following table lists the common H-beam specifications used by Liweiyuan's steel structures.
Model |
Height (mm} |
Width (mm)) |
Web Thickness (mm) |
Flange Thickness (mm) |
Cross-Sectional Area (cm²) |
Theoretical Weight (kg/m |
H100×100 |
100 |
100 |
6 |
8 |
21.90 |
17.2 |
H125×125 |
125 |
125 |
6.5 |
9 |
30.31 |
23.8 |
H150×150 |
150 |
150 |
7 |
10 |
40.55 |
31.9 |
H200×200 |
200 |
200 |
8 |
12 |
54.65 |
42.9 |
H250×250 |
250 |
250 |
9 |
14 |
72.40 |
56.8 |
Green Steel Structure Buildings are widely used in various building types, including industrial plants and residential buildings, which have high requirements for green and energy-saving construction.
1. Is the initial cost of Green Steel Structure Buildings higher than traditional buildings?
Our products may have a slightly higher initial cost, but they offer lower lifecycle costs. This reduces long-term overall costs by reducing building energy consumption, saving energy during operation, and recovering the value of steel after demolition.
2. How is your quality control?
Our products are certified to the EU CE EN1090 standard and ISO9001:2016. We have professional quality inspectors who conduct comprehensive product inspections throughout the entire process.
3. Do you provide design services?
Yes, we have a team of engineers who can design Green Steel Structure Buildings according to your requirements. We can provide architectural drawings, structural drawings, fabrication details, and installation drawings, and provide them for your approval at different stages of the project.
4. What is the delivery time?
Delivery time depends on the size and number of buildings. Generally, delivery is within 30 days after payment.
5. How can I get a quote?
You can contact us 24/7 via email, phone, WhatsApp, and more, and we'll get back to you as soon as possible.